Altınzeybek-2 Pond Received The Provisional Acceptance

Altınzeybek-2 Pond Received The Provisional Acceptance

The statement of Balıkesir 25th Regional Directorate of State Hydraulic Works (DSI) reveals that the provisional acceptance of Altınzeybek-2 Pond, which was undertaken by Doğu Biga Mining (Alamos Gold) with the protocol signed with State Hydraulic Works (DSI), was undertaken by the commission headed by the Dams and HEPP Branch Manager M. Necati Ercan.

 

“Altınzeybek-2 Pond, located near the village of Kumarlar in Çan district, has a clay core rockfill type and a height of 29 m above the foundation. The need for agricultural irrigation (3760 decares), drinking water (1.47 lt/h) and utility water (17.36 lt/h) of the local villages will be met with the 3.8 million cubic meters of water stored in the reservoir area.”